時(shí)間:2011-04-05 09:32來(lái)源:藍(lán)天飛行翻譯 作者:航空 點(diǎn)擊:次
29 Handhold 手柄 30 Kick in step 腳蹬 31 Compressed gas bottles for inflation of forward floatation bages,choice of using nitrogen or helium供應(yīng)前部氣囊的壓縮氣瓶,可選氮?dú)饣蚝?br /> 32 Composite cabin floor 復(fù)合材料地板 33 Composite cabin interior side panels 復(fù)合材料客艙壁板 34 Cabin windows also available as push out windows客艙窗戶,有可推出的窗戶 35 50x70.75in cabin door which slides aft。 The rear part of the door slides into a slot in the forward part of the sponson向后滑動(dòng)的客艙門,門后部滑入浮筒前面的縫隙里。 36 Escape panel in cabin door 客艙門護(hù)板 37 Emergency exit, two on Port side 緊急出口,左側(cè)兩個(gè)。 38 Compressed gas bottles for inflation of aft floatation bag, choice of using nitrogen or helium structure and general 供應(yīng)后部氣囊的壓縮氣瓶,可選氮?dú)饣蚝? 39 Right hand sight glass for float bottle pressure壓縮氣瓶壓力觀察窗 40 Rear loading ramp, shown in down position。 Optional baggage shelf, bulkhead and nets which are accessible from the ramp are available (1,000lb maxlmum weight, 140ft3) 后部裝載斜板,圖示為放下位置?蛇x行李架、防水壁和網(wǎng)。 41 Rear fuselage of aluminium alloy with composite fairings。 鋁合金后機(jī)身帶復(fù)合材料整流罩 42 Composite fairings covering drive shaft to tail rotor 尾傳動(dòng)軸復(fù)合材料整流罩 43 Tail Structure of aluminium alloy with machined frames and composite fairings。 Built by Jingdezhen Helicopter Group' China 鋁合金尾梁結(jié)構(gòu)和復(fù)合材料整流罩,有中國(guó)景德鎮(zhèn)直升機(jī)公司制造。 44 Fixed horizontal stabiliser of composite construction with machined spars 復(fù)合材料固定水平安定面, 45 Support strut for horizontal stabiliser 水平安定面支柱 46 Pull out maintenance steps 收放維護(hù)踏板 47 Removable composite leading edge fairing 可拆卸尾整流罩前緣 48 Removable composite trailing edge fairing 可拆卸尾整流罩后緣 49 Swiveling 2-axis hook,1O,O00lb capacity 2軸旋轉(zhuǎn)吊鉤,可掛10,000磅。 structure and general |
上一篇:直升機(jī)全方位講述
下一篇:直升機(jī)原理詳解